Bamboo Living Homes by Bamboo Technologies
 

Assembling Bamboo Houses on the Home Site
After a home order is placed, building in Vietnam and shipping to the USA may take six months. This allows the homeowner time to get permits and build platform and install electrical and plumbing.
For building permits, blueprints from BT are signed by an architect. Owners provide building site and local building code information. Permit fee and time required to get a permit varies by jurisdiction.
Owner builds the platform, hiring contractors or doing it themselves. Permits are needed for plumbing, electrical and sewage system. BT can provide blueprints for the platform and a material list.
Bamboo house is assembled and weatherproof in 3 to 10 days. Owner contracts a supervisor qualified by BT to come to the home site and direct the owner's construction crew.
See a 4 minute time-lapse video "Assembling a 30' Bamboo Pavilion in Three Days".
Owner installs roof, doors, windows, electrical, plumbing, insulation, flooring, appliances. furniture.
Get inspections for plumbing and electrical and occupancy permit. BT will inspect the house for final compliance, to make sure every home is built to perfection. Move in with a house warming party and blessing. It will warm your friends and your new home.
   
Bamboo Living | Homes | Resorts | Owners | Movies | Bamboo | Environment | Vietnam | Factory | Assembly | Research | Links
   
  tel: 808.572.1007 | bamboo@bambootechnologies.com | fax: 808.573.4855
PO Box 1238, Haiku HI 96708 USA
www.bambooliving.com | © 2003, 2004, 2005, 2006, 2007 | www.bambootechnologies.com